Prince George's County Stadium
Bowie Baysox in Bowie, MD
Project Snapshot
Project Name: Prince George’s County Stadium Concrete Restoration
Client: Bowie Baysox Baseball Club
Location: Bowie, Maryland
Contractor:
Mid-Atlantic Remodeling and Design
Project Duration:
10 Days
Maintenance Program:
3 Cleanings Per Year | 10-Year Service Period
Project Scope Included
- Full stadium concrete pressure washing
• Main concourse cleaning
• Seating bowl and bleacher concrete restoration
• Exterior stadium concrete cleaning
• Walkways, ramps, and entrances
• Concrete surface repairs
Estimated Surface Area Cleaned
50,000 – 75,000+ Square Feet of Concrete Surfaces
Equipment Used
- Commercial hot-water pressure washing systems
• Surface cleaners for large concourse areas
• High-pressure detail wands for structural areas
• Industrial degreasing and cleaning solutions
Result
Complete restoration of all accessible stadium concrete surfaces in preparation for Opening Day baseball season.
Long-Term Maintenance Partnership
Mid-Atlantic Remodeling and Design maintained a long-term working relationship with the stadium, performing comprehensive cleanings three times per year for a 10-year period.
These ongoing maintenance projects ensured that Prince George’s County Stadium remained in top condition throughout multiple baseball seasons, supporting a safe and welcoming environment for thousands of fans attending games and events each year.
Project Results
✔ Full-stadium concrete restoration
✔ Completed within a 10-day schedule
✔ Exterior and interior stadium concrete cleaned
✔ Structural and surface concrete repairs performed
✔ Restored appearance of high-traffic public areas
✔ Long-term maintenance program spanning 10 years
Scope of Work
The scope of work included the comprehensive cleaning and restoration of all concrete surfaces throughout the stadium, including:
- Main concourse walkways
- Seating bowl and bleacher concrete
- Stadium entryways and access ramps
- Exterior building concrete surfaces
- Public circulation areas and corridors
- Structural concrete throughout the stadium
In addition to the extensive power washing operation, our team also performed targeted concrete repairs in high-traffic areas to address surface wear and deterioration.
Using professional-grade commercial pressure washing equipment and detailed surface treatment techniques, the concrete throughout the stadium was fully restored from years of accumulated dirt, stains, and environmental buildup.
Project Execution & Results
Despite the massive size of the facility, the project was completed within an aggressive 10-day schedule to ensure the stadium was fully prepared for Opening Day.
Our crews worked systematically throughout the facility, coordinating equipment, water management, and access logistics across multiple levels of the stadium to achieve a complete restoration of the concrete surfaces.
The final result was a stadium that appeared fresh, clean, and ready for fans, with concrete surfaces restored to a bright, like-new appearance.